SH58 interchange/Transmission Gully Stage 2
Head contractor RMS Contracting engaged PCL to complete the surfacing on this $1.75 million motorway interchange project.
The project was inclusive of milling to a design height of 265mm below the surface level, then building up in two structural layers of AC20 asphalt with an SMA wearing course, plus various chip-seal applications.